Requirements
I have read and understand the information above:
Yes
Dates
Received Date:
05/09/2023
Accepted Date:
05/18/2023
Issued Date:
07/13/2023
Expiration Date:
07/12/2025
Appeal Period End Date:
07/23/2023
GIS
Neighborhood Association:
Southeast Boise
Comprehensive Planning Area:
Southeast
Land Use:
Industrial
Local Landmark:
N/A
National Landmark:
N/A
Historic District:
N/A
General
Plans Submitted:
Electronic
Type of Application:
Design Review
Modifying an Existing Case:
No
Review Authority:
Administrative
Is the proposal utilizing the Housing Bonus Ordinance in Section 11-06-03.4:
No
Use:
Industrial
Phased Project:
No
Property Information
Zoning District:
C2
Property in Historic District:
No
Property In Design Review Zone:
No
Property In Hillside:
No
Property In Floodplain:
No
Flood Zone:
N/A
Property In Wildland Urban Interface (WUI):
Yes
WUI Name:
undefined
Size of Property:
2.6
Airport Influence:
B
Irrigation Ditches or Canals on/adjacent to Property:
No
Overhead Powerlines or Utility Lines on/adjacent to the Property:
Yes
Site Design
Building footprint:
26000
Landscaping footprint:
8000
Paving footprint:
10000
Other uses footprint:
300
Description of other uses:
The design features a back-up generator, water tank and oxygen tank that are separate from the main structure.
Landscape
Prominent Trees or Vegetation on Property:
No
Parking
Does this project include shared parking?:
Yes
Number of shared spaces:
10
Does this project include assigned or reserved parking?:
No
Does this project include parking reduction?:
No
Does this project include off-site parking?:
No
Proposed Structures
Number of Proposed Structures:
5
Fire Prevention
Fire Flow:
55
Is the building sprinklered?:
No
Number of Existing Hydrants:
1
Solid Waste Legacy Data
How will trash and recycling containers be stored:
Alley Service (If Available)