Requirements
I have read and understand the information above:
Yes
Dates
Received Date:
01/04/2022
Issued Date:
02/10/2022
Expiration Date:
02/10/2024
Appeal Period End Date:
02/20/2022
GIS
Neighborhood Association:
South Eisenman
Comprehensive Planning Area:
Airport
Land Use:
Industrial
Local Landmark:
N/A
National Landmark:
N/A
Historic District:
N/A
General
Plans Submitted:
Electronic
Type of Application:
Design Review
Modifying an Existing Case:
No
Review Authority:
Design Review Committee
Is the proposal utilizing the Housing Bonus Ordinance in Section 11-06-03.4:
No
Use:
Industrial
Phased Project:
No
Property Information
Zoning District:
M-1D
Property in Historic District:
No
Property In Design Review Zone:
Yes
Property In Hillside:
No
Property In Floodplain:
No
Flood Zone:
N/A
Property In Wildland Urban Interface (WUI):
Yes
WUI Name:
undefined
Size of Property:
40.04
Airport Influence:
B
Irrigation Ditches or Canals on/adjacent to Property:
No
Overhead Powerlines or Utility Lines on/adjacent to the Property:
Yes
Hazards on the Property:
N/A. The Applicant has conducted a Phase 1 Environmental Site Assessment (ESA) that determined no recognized environmental conditions (RECs) are present on-site.
Site Design
Building footprint:
392062
Landscaping footprint:
289818
Paving footprint:
450680
Landscape
Prominent Trees or Vegetation on Property:
No
Parking
Does this project include shared parking?:
No
Does this project include assigned or reserved parking?:
No
Does this project include parking reduction?:
No
Does this project include off-site parking?:
No
Existing Structures
Number of Existing Structures:
2
Explain Existing Structures to Remain:
Existing City of Boise Sanitary Sewer sampling station/monitoring shed. Final method of adjustment and location to be determined through design. Hearthside Food Solutions LLC also currently has an existing building and parking lot on site.
Total Existing Units
Total Number of Existing Units:
0
Proposed Structures
Number of Proposed Structures:
3
Total Proposed Units
Total Number of Proposed Units:
0
Fire Prevention
Fire Flow:
90
Is the building sprinklered?:
Yes
Number of Existing Hydrants:
2
Number of Proposed Hydrants:
15
Solid Waste Legacy Data
How will trash and recycling containers be stored:
Standard Enclosure