Requirements
I have read and understand the information above:
Yes
Dates
Received Date:
10/05/2021
Accepted Date:
10/06/2021
Issued Date:
11/12/2021
Expiration Date:
11/12/2023
Appeal Period End Date:
11/22/2021
GIS
Neighborhood Association:
Barber Valley
Comprehensive Planning Area:
Barber Valley
Land Use:
Office
Local Landmark:
N/A
National Landmark:
N/A
Historic District:
N/A
General
Plans Submitted:
Electronic
Type of Application:
Design Review
Modifying an Existing Case:
No
Review Authority:
Administrative
Is the proposal utilizing the Housing Bonus Ordinance in Section 11-06-03.4:
No
Use:
Office
Phased Project:
No
Property Information
Zoning District:
SP-02
Property in Historic District:
No
Property In Design Review Zone:
No
Property In Hillside:
No
Property In Floodplain:
No
Flood Zone:
AE
Property In Wildland Urban Interface (WUI):
No
WUI Name:
undefined
Size of Property:
0.64
Airport Influence:
Not in Airport Influence Area
Irrigation Ditches or Canals on/adjacent to Property:
No
Overhead Powerlines or Utility Lines on/adjacent to the Property:
No
Hazards on the Property:
n/a
Site Design
Building footprint:
5500
Landscaping footprint:
3085
Paving footprint:
30424
Landscape
Prominent Trees or Vegetation on Property:
No
Parking
Does this project include shared parking?:
No
Does this project include assigned or reserved parking?:
No
Does this project include parking reduction?:
No
Does this project include off-site parking?:
No
Existing Structures
Number of Existing Structures:
0
Total Existing Units
Total Number of Existing Units to Remain:
0
Proposed Structures
Number of Proposed Structures:
1
Fire Prevention
Fire Flow:
20
Is the building sprinklered?:
Yes
Solid Waste Legacy Data
How will trash and recycling containers be stored:
1