Requirements
I have read and understand the information above:
Yes
Dates
Received Date:
05/28/2021
Accepted Date:
06/01/2021
Issued Date:
08/12/2021
Expiration Date:
08/12/2023
Appeal Period End Date:
08/22/2021
GIS
Neighborhood Association:
Barber Valley
Comprehensive Planning Area:
Barber Valley
Land Use:
Office
Local Landmark:
N/A
National Landmark:
N/A
Historic District:
N/A
General
Plans Submitted:
Electronic
Type of Application:
Design Review
Modifying an Existing Case:
No
Review Authority:
Administrative
Phased Project:
Yes
Explain Any Project Phases:
The project will include three parts the athletic facility, temporary housing, and a wellness facility. Each will be submitted under a separate permit. Temporary housing will be permitted first followed by the athletic facility and the wellness facility.
Property Information
Zoning District:
SP-02
Property in Historic District:
No
Property In Design Review Zone:
No
Property In Hillside:
No
Property In Floodplain:
No
Flood Zone:
AE
Property In Wildland Urban Interface (WUI):
No
WUI Name:
undefined
Size of Property:
6.79
Airport Influence:
Not in Airport Influence Area
Irrigation Ditches or Canals on/adjacent to Property:
No
Overhead Powerlines or Utility Lines on/adjacent to the Property:
Yes
Hazards on the Property:
None
Site Design
Building footprint:
68022
Landscaping footprint:
90308
Paving footprint:
137455
Landscape
Prominent Trees or Vegetation on Property:
Yes
General Location:
There are two trees in the parking islands for the parking along Marianne Williams Park and the site property boundary that are going to have to be transplanted when all that curb work get demo’ed and the landscape repaired because they conflict with proposed site access.
Proposing Removal of any Prominent Trees or Vegetation:
Yes
Please Explain Removal:
Intent to work with Boise Parks & Rec. staff to relocate trees.
Size of Prominent Trees or Vegetation:
(2) 4" Cal. trees.
Types of Prominent Trees or Vegetation:
Class II shade trees - maple.
Parking
Does this project include shared parking?:
Yes
Number of shared spaces:
52
Does this project include assigned or reserved parking?:
No
Does this project include parking reduction?:
Yes
Number of spaces reduced from required:
86
Does this project include off-site parking?:
Yes
Number of off-site parking spaces:
13
Proposed Structures
Number of Proposed Structures:
9
Fire Prevention
Fire Flow:
60
Is the building sprinklered?:
Yes
Number of Existing Hydrants:
1
Number of Proposed Hydrants:
2
Solid Waste Legacy Data
How will trash and recycling containers be stored:
1