Requirements
I have read and understand the information above:
Yes
Dates
Received Date:
05/12/2021
Accepted Date:
05/13/2021
Issued Date:
07/15/2021
Expiration Date:
07/15/2023
Appeal Period End Date:
07/25/2021
GIS
Neighborhood Association:
Barber Valley
Comprehensive Planning Area:
Barber Valley
Land Use:
Office
Local Landmark:
N/A
National Landmark:
N/A
Historic District:
N/A
General
Plans Submitted:
Electronic
Type of Application:
Design Review
Modifying an Existing Case:
No
Review Authority:
Administrative
Use:
Office
Phased Project:
No
Property Information
Zoning District:
SP-02
Property in Historic District:
No
Property In Design Review Zone:
No
Property In Hillside:
No
Property In Floodplain:
Yes
Flood Zone:
AE
Property In Wildland Urban Interface (WUI):
No
WUI Name:
undefined
Size of Property:
0.57
Airport Influence:
Not in Airport Influence Area
Irrigation Ditches or Canals on/adjacent to Property:
No
Overhead Powerlines or Utility Lines on/adjacent to the Property:
No
Site Design
Building footprint:
8426
Landscaping footprint:
12459
Paving footprint:
23584
Landscape
Prominent Trees or Vegetation on Property:
No
Parking
Does this project include shared parking?:
No
Does this project include assigned or reserved parking?:
No
Does this project include parking reduction?:
No
Does this project include off-site parking?:
Yes
Number of off-site parking spaces:
57
Existing Structures
Number of Existing Structures:
0
Proposed Structures
Number of Proposed Structures:
1
Fire Prevention
Fire Flow:
2000
Is the building sprinklered?:
No
Number of Existing Hydrants:
0
Number of Proposed Hydrants:
1
Solid Waste Legacy Data
How will trash and recycling containers be stored:
1