Requirements
I have read and understand the information above:
Yes
Dates
Received Date:
03/01/2021
Accepted Date:
03/02/2021
Issued Date:
05/13/2021
Expiration Date:
01/08/2023
Appeal Period End Date:
06/10/2021
GIS
Neighborhood Association:
Barber Valley
Comprehensive Planning Area:
Barber Valley
Land Use:
Large Lot/Rural
Local Landmark:
N/A
National Landmark:
N/A
Historic District:
N/A
Property Information
Zoning District:
A-1DA
Property in Historic District:
No
Property In Design Review Zone:
No
Property In Hillside:
Yes
Property In Floodplain:
No
Flood Zone:
N/A
Property In Wildland Urban Interface (WUI):
Yes
WUI Name:
undefined
Airport Influence:
Not in Airport Influence Area
Size of Property:
17.34
General
Type of Application:
Preliminary
Plans submitted as:
Electronic
Please list all previously approved or currently associated file(s):
-Transportation and Utility Systems and Facilities on Federal Land
- Approved DEQ for Sanitary Sewer Plans: DRI1853
- Approved Hillside Grading Permit: GRD20-00091
- ACHD Plan Acceptance: SUP19-0023
- Approved Suez Water Plan - Re. No. 19023/Map No. 0919-4
- Approved Pressure Irrigation System: IRR-258
- Bureau of Rec. Arrowrock Division Boise Project: Contract No.8-07-11-L5004
- Approved Canal Crossing w/ Bureau of Rec.: SF-299
Jurisdiction:
City
Subdivision Information
Use:
Residential Single Family
Number of buildable lots/units:
17
Number of common lots/units:
4
Total number of lots/units:
21
Buildable lots/units per acre:
0.98
Are any waivers/modifications being requested?:
No
Are private streets proposed?:
Yes
Proposed private street explanation:
Two private drives with cul-de-sac turnarounds.
Public Works
On-Site Stormwater Retention Method:
Subsurface stormwater conveyance system disposal facilities are currently designed as below-ground treatment facilities into seepage beds within the lower-elevation portions of the site.
Number of Street Lights:
2