Dates
Received Date:
03/18/2022
Expiration Date:
09/14/2022
Requirements
I have read and understand the information above:
Yes
GIS
Building Inspector Name:
Brandon Shaw
Building Inspector Phone:
208-954-9358
Electrical Inspector Name:
Eric Story
Electrical Inspector Phone:
208-985-3493
Erosion Sediment Control Inspector Name:
Andrew Long
Erosion Sediment Control Inspector Phone:
208-794-8996
Fire Inspector Name:
Troy Cobbley
Fire Inspector Phone:
208-794-9483
Mechanical Inspector Name:
Jack Reynolds
Mechanical Inspector Phone:
208-803-2395
Plumbing Inspector Name:
David Babcock
Associated Records
Is there an existing permit associated with this project?:
No
General Information
Application Type:
520 - Major Tenant Improvement (Level 3)
Plans Submitted As:
Electronic
This application is being submitted for multiple tenant spaces:
No
Type of Permit:
Tenant Improvement (Existing)
Type of Use:
Commercial
Type of Work:
Tenant Improvement (1st Time)
Type of Construction:
VB
Tenant Name:
Primal Coffee
Existing Building Area:
624
New Building Area:
0
Total Building Area:
624
Total Tenant Area:
624
Will this project increase the square footage of this tenant space:
No
Number of Stories:
1
Building Height:
10' 0"
Preliminary Plan Review Has Been Conducted:
No
Fire Alarm System Present:
Yes
Building is Fully Sprinklered:
No
Fire Flow:
2000
Residual Pressure:
20
Property Information
Zoning District:
C-1D
Property in Historic District:
No
Property In Design Review Zone:
Yes
Property In Hillside:
No
Property In Floodplain:
No
Flood Zone:
N/A
Property In Wildland Urban Interface (WUI):
No
WUI Name:
undefined
Certificate of Value
Total Project Value:
10000
Will the owner be supplying any equipment?:
Yes
I certify that the Values and Scope of Work given is the most accurate available at this time:
Yes
Erosion & Sediment Control
Project will disturb 2 cubic yards of soil or more:
No
Required Inspections
PW Drainage:
Yes
PW Street Lights:
Yes
PW Hillside:
No
Impact Fees
Type of Development:
Retail
Changed Use:
Yes
Mixed Use:
No
New Assisted Living Units:
No
New Residential Units:
No
Impact Fee Exemptions
Filing a Request for the City Impact Fee Exemption:
Yes
Rebuilding the same amount of floor space of a structure destroyed by fire or other catastrophe, provided the structure is rebuilt and ready for occupancy within two (2) years of destruction.:
No
Remodeling or repairing a structure which does not increase the number of square footage or residential units.:
Yes
Replacing a residential unit, including a manufactured home, with another residential unit on the same lot, provided the number of residential units does not increase:
No
Placing a temporary construction trailer or office on a lot.:
No
Constructing an addition on a residential structure which does not increase the number of residential units.:
No
Adding uses that are typically accessory to residential uses, such as tennis courts or clubhouses, unless it can be clearly demonstrated that the use creates a significant impact on the infrastructure capacity of the Parks and Recreation, Fire, and Police Departments.:
No